Owner's rep for the permit phase
For owners and investors with no permit staff: one person who runs the permit side of your project with the agencies, your design team and your contractor, from the first check to closeout.
Miami-Dade, Broward and Palm Beach counties. In the City of Miami a local firm files and handles all contact with the City.
Sample content: timelines are examples. Fees are being set.

What's included
Scope
- Owners building or renovating from out of state or abroad
- Small developers without an in-house permit team
- Small businesses opening a new location
- Projects that need several permits from several agencies
What we do
- A permit map: every permit the project needs, in filing order
- A check of each package before it is filed
- Tracking of every review, comment and inspection in your portal
- A short written update on a fixed day each week
- Closeout through the certificate of occupancy
Not included
- Managing construction. Your licensed general contractor runs the job and stays in direct contact with you.
- Budget control, change orders and pay applications.
- Drawings and anything that needs a seal, including traffic control plans. A licensed partner, or your own design professional of record, prepares and seals them. We coordinate the work and check the package.
- Construction work in the field.
- Agency fees. They are passed through at cost and shown as an estimate in your quote.
- The agency's decision. The agency decides on approval; we make sure the package is complete and clear.
Documents we'll ask you for
We act for you on permits only. Decisions stay with you, and we confirm them in writing before we pass them on.
You2
- Project address and a description of the work
- Names of your design team and general contractor
Us1
- Permit map and weekly updates
Licensed partner1
- Drawings and sealed documents
Property owner1
- Letter authorizing us to act for you on permits
You send the site information. We assemble, check, file and track the package. Drawings and anything that needs a seal, including traffic control plans, are prepared and sealed by a licensed partner or your own design professional of record.
| Document | Who provides it |
|---|---|
| Project address and a description of the work | You |
| Names of your design team and general contractor | You |
| Letter authorizing us to act for you on permits | Property owner |
| Permit map and weekly updates | Us |
| Drawings and sealed documents | Licensed partner |
Steps and timing
- [01]Permit map: Every permit, agency and filing order for the project. No permit turns up late and holds the others.Sample: 1–2 weeks
- [02]Package checks: Each package checked before it goes in, so it is not returned for a missing sheet or signature.Through design
- [03]Reviews and comments: Tracked in one place, each comment with a name and a due date. None sits unanswered because nobody knew it was theirs.Agency pace
- [04]Inspections and closeout: Open items followed until the certificate of occupancy, so the finished building is not held by a forgotten revision.Through construction
What lands on your desk
The permit map
Every permit the project needs, in filing order, with who decides each one.
- Zoning reviewCounty zoningIssued
- Building permitBuilding departmentIn review, round 2
- Right-of-way permitPublic worksWaits on the building permit
- Water and sewer connectionWater and sewer utilityApplication drafted
- State road accessFDOT, only if the street is a state roadNot needed here
- Final inspections and COBuilding departmentAfter construction
The weekly update
One page, the same day each week. What moved, what is waiting and what needs you.
Week 6Sample project: 12 apartments, Miami-Dade County
Moved this week
- Zoning review issued on Tuesday.
- Building comments, round 2: structural sheets answered by your design team and refiled Thursday.
Waiting on
- Building department: second review of the refiled sheets.
- Your contractor: proof of insurance for the right-of-way permit.
Needs your decision
- Driveway on the north or the east side? The east side avoids a utility pole and one extra review.
Next week
- File the water and sewer application.
- Ask public works for the pre-application meeting.
Sample content, written to show the format. Your map comes from your address and scope.
Open the sample client portalQuestions
Do you replace my general contractor or architect?
No. They do their work under their own licenses. We run the permit side between them and the agencies, and we report to you.
Do you manage the construction?
No. We are not a general contractor and do not supervise the work. This service covers permits, reviews, inspections and closeout.
I am not in the state. Does that work?
Yes. Status, documents and messages are in your portal, and you get a written update each week.
What happens when the agency sends comments?
Most packages get at least one round. We draft the answers, tell you what we need from you, send sealed items to the licensed partner or your design professional of record, and resubmit.