How it works: follow one project
A made-up project, step by step. Each step shows the problem, what we do about it, what you get, and what you see in your portal.
Step 1 of 6
You write to us
- The problem
- The permit is stuck, or nothing is filed yet. Three agencies are involved and nobody is in charge of all of them.
- What we do
- Send the address and what you have. We reply with the permits involved, their order and a written quote.
- What you get
- A straight answer on what the project needs, before you commit to anyone.
- Address
- 12 apartments, Miami-Dade County
- What is planned or stuck
- Building permit returned with comments. No one knows what else is needed.
- Files
- comment-letter.pdf · drawings.pdf
ReceivedReply with the permits involved and a quote
What lands on your desk
You stop calling the architect, the contractor and three agencies to find out where things stand. It is on one page, and it comes to you.
The permit map
Every permit the project needs, in filing order, with who decides each one.
- Zoning reviewCounty zoningIssued
- Building permitBuilding departmentIn review, round 2
- Right-of-way permitPublic worksWaits on the building permit
- Water and sewer connectionWater and sewer utilityApplication drafted
- State road accessFDOT, only if the street is a state roadNot needed here
- Final inspections and COBuilding departmentAfter construction
The weekly update
One page, the same day each week. What moved, what is waiting and what needs you.
Week 6Sample project: 12 apartments, Miami-Dade County
Moved this week
- Zoning review issued on Tuesday.
- Building comments, round 2: structural sheets answered by your design team and refiled Thursday.
Waiting on
- Building department: second review of the refiled sheets.
- Your contractor: proof of insurance for the right-of-way permit.
Needs your decision
- Driveway on the north or the east side? The east side avoids a utility pole and one extra review.
Next week
- File the water and sewer application.
- Ask public works for the pre-application meeting.
Sample content, written to show the format. Your map comes from your address and scope.
Open the sample client portalYour other options, and where we differ
Scopes differ from firm to firm. Ask each one what is included before you compare.
What we do not do
An owner's rep in Miami usually means full construction oversight. Ours covers the permit phase, and we say so before you hire us.
- We do not manage construction. Your licensed general contractor runs the job and stays in direct contact with you.
- We do not handle budgets, change orders or pay applications.
- We do not prepare or seal drawings. A licensed partner, or your own design professional of record, prepares and seals them. We coordinate the work and check the package.
- We do not promise approval, and we do not sell access. The agency decides. Our work is a complete, clear package and fast answers to comments.
- Sarah worked at the City of Miami, so for two years after leaving she does not contact City staff on projects. A local firm files and handles all contact with the City.